Hanwha - ACE Stage 1

Hanwha - ACE Stage 1

Built

The $170 million Hanwha Armoured Vehicle Centre of Excellence (H-ACE) is located next to Avalon Airport in Geelong.

Once completed the 32,000m2 facility will initially be focused on the production of Hanwha’s AS9 self-propelled howitzer and AS10 Armoured Ammunition Resupply vehicles with capacity for future expansion.

 

The facility includes:

  • multiple assembly and production lines

  • a 1,500-metre test track

  • a deep-water test facility

  • an R&D center and;

  • an obstacle course to test capability

 

Toohey’s Form-crete have been contracted to deliver the concrete package for the facility including:

 

  • Excavation and pouring of all pad footings, strip footings, rafts and beams to ground slabs

  • Supply of all reinforcement and concrete

  • FRP ground slabs approx. 18,000m2

  • FRP suspended post tensioned slab approx. 2775m2

  • Pour and finish in-situ columns and Stairmaster’s

  • Supply, pour and finish all concrete approx. 10,000m3